Recent Sacramento work
Real projects. Real numbers. Real before-and-afters.
Drag the slider on any before/after to see exactly what changed. These are actual recent jobs from Sacramento, Granite Bay, El Dorado Hills, Folsom, Roseville, and Loomis — with the same days on site and budget you'd be quoted today.
Drag the sliders
Before / after.
After
9 working days · from $14,200
Tub-to-shower conversion · Granite Bay
Alcove tub out, linear floor drain in, full-system waterproofing, warm large-format porcelain, frameless glass partition.
After
14 working days · from $18,500
LED concrete patio · El Dorado Hills
Demoed the failing pad, poured smooth-finish concrete in clean rectangular panels with recessed warm-white LEDs along the saw-cut joints.
After
6-10 weeks · from $58,000
Transitional kitchen · Fair Oaks
Cabinets refinished in warm cream shaker, honed soapstone counters, stacked subway backsplash, custom plaster hood, wide-plank white oak floor.
Recent finished work
Builds across the Sacramento region.
Tap a card to see the project up close, real day count, and the budget it landed at. Filter by what you're actually thinking about.
Material + finish detail
Built like furniture, finished like jewelry.
Mitered corners, hidden fasteners, dimmable LED channels, hand-honed stone. The details are why these projects feel custom instead of contractor-grade.

Book-matched quartzite waterfall
Kitchen remodel · Fair Oaks

Concealed brushed-nickel hinge
Frameless shower glass

Steel-bracketed cedar joinery
Motorized pergola · Loomis

Mitered porcelain corner
Walk-in shower · Granite Bay

In-slab LED channel
Decorative concrete · El Dorado Hills

Soapstone outdoor kitchen
Outdoor kitchen · Roseville

Foothill-view soaking tub
Primary bath · Folsom

Motorized louvered pergola
Pergola · Loomis

White oak slab island
Kitchen remodel · Fair Oaks
Like what you see?
Let's build yours next.
Free in-home consultation. A Project Manager comes out, measures, walks the project with you, and writes a real itemized estimate.
